3 Ways to Track Projects in monday.com: A Complete Tutorial
In this step-by-step guide, a certified monday.com partner shows you three distinct approaches to easily track projects, regardless of your company size or monday.com plan. The example uses an Airbnb property renovation business to illustrate how to manage multiple projects (property purchases) and their associated tasks (contracts, permits). For a broader understanding of how these methods fit into overall project management, see our Comprehensive Overview of Project Management Concepts and Practices.
Method 1: Simple Single Board with Subitems
This is the easiest setup, perfect for small teams or simple projects.
- Structure: Create one board. Each project (e.g., a property) is a main item. All tasks for that project (e.g., “Finalize Contract,” “Get Permit”) are subitems under that item.
- Column Rollup: Use a Status column on subitems. Enable “Show summary on the parent item” (via the three dots menu) to see a condensed status view at the project level. Alternatively, add a Progress column to subitems and roll it up for a percentage completion indicator.
- Benefit: Everything is in one place. Glance at the board to see the status of every project instantly.
Method 2: High-Level and Low-Level Boards (Connected Boards)
Ideal for larger projects or when you need separate, detailed task boards per project. This approach mirrors concepts found in the Waterfall vs Scrum: Understanding Project Management Frameworks guide, where separating planning levels can improve clarity.
- Structure: One high-level board lists all projects (e.g., all properties). Each project has its own dedicated low-level board containing all its tasks.
- Connection: Use a Connected Boards column on the high-level board to link to each low-level board. Enable the two-way connection checkbox so updates sync automatically.
- Mirror Key Columns: Use a Mirror Column (e.g., a status or progress column) from the low-level board to the high-level board so you can see task progress at a glance.
- Limitations:
- Pro plan: Max 20 connected boards.
- Enterprise plan: Max 60 connected boards.
- Automation Tip: Use match automations to automatically connect new items between boards (link to tutorial provided in the video).
Method 3: Enterprise Portfolio Feature (Projects & Portfolios)
The most powerful option, available only on the monday.com Enterprise Work Management plan.
- Setup: Create a Portfolio (labeled “Project” in the interface) from the + button. Add each project (e.g., each property) individually. monday.com automatically creates the low-level board for each project.
- Automatic Sync: Tasks added to a low-level board are automatically connected to the portfolio – no manual setup needed.
- Rich Metrics: The portfolio board automatically shows:
- Project Health: On Track, At Risk, Off Track.
- Auto-generated Snapshot: Visual overview of all projects.
- Status & Progress Percentages (no manual progress columns required).
- Link to a dedicated dashboard for enterprise-level reporting.
- Scalability: Can connect up to 100-200+ projects (monday.com is actively increasing this to 1,000). Critical for large-scale operations.
- Advantage over Method 2: The portfolio bypasses dashboard connection limits (Pro: 10 boards; Enterprise: 20 boards), allowing all project data in a single dashboard.
Key Takeaways
| Method | Best For | Plan Requirement | Complexity | | :--- | :--- | :--- | :--- | | 1. Single Board + Subitems | Small teams, simple projects | All plans | Low | | 2. High-Level/Low-Level Boards | Medium complexity, per-project task separation | Pro or Enterprise | Medium | | 3. Enterprise Portfolio | Large-scale project management, executive reporting | Enterprise only | Moderate |
Tip: If you’re on the Enterprise plan, start with the Portfolio feature for maximum automation and visibility. For others, begin with the single-board approach and upgrade to connected boards as your project count grows.
Next Steps: Watch the linked video for a deeper dive into the Portfolio feature, and hit the subscribe button for more monday.com tips. If you'd like a deeper dive into aligning stakeholders with these tools, check out our Comprehensive Guide to Stakeholder Management in Project Management.
No matter what kind of company you are, if you're using monday.com to track your projects, I'm going to show you three
different ways that you can easily track your projects. So, let's jump in. Hi, my name is Tara and I'm a certified
monday.com partner and the founder of Simple Day. My goal is to help you build powerful yet simple workflows with
monday.com. If you need help with a custom implementation, my [music] contact details are in the description
below. Let's jump into today's tutorial and make Monday the best part of your week.
For this example, I'm going to talk about one of my recent clients. Basically, what they would do is rent
out different Airbnb properties, but what they needed to track within Monday.com was the whole process of
purchasing the property and then doing construction on the property because they all needed construction. and then
they had a totally separate process for actually renting everything out. So, we're talking about the process of
purchasing the properties and renovating them. And that's what they did within Monday. I'm going to start with the
simplest easy way to set up a structure for this type of scenario. The first way that you can easily track projects is by
using a board. You need one board and you have everything within this board. you have all of your projects and all of
the tasks that are associated with this project. So here you can see on the item level I have three different properties
that I need to manage. So three different projects. Here's some basic information of for them. Now on a sub
item level I'm going to add all of my tasks that I need to do. This way everything is in one place and I can
keep track of everything that I need to do for the project. To make this simple, I'm going to add two really simple
tasks. Obviously, I realize that purchasing properties is a lot more work than these two simple things. So, first
we're going to have finalize contracts and the second one is get a permit. Okay, so these are the two tasks that
I've added as sub items. Now, one thing that I can do is I can just have the status column. Actually, it would
probably be the other way around. First, I would do the contract and then I would work on the permit. So here you can see
if I open up the item, see all the sub items, I see the status of my projects. Now let's say I want to view all of my
projects and all of their status in one place. One thing that I can do is roll up the status column to the item level.
So click on the three dots and then choose show summary on the parent item. And here you can see that I have a
summary of what's going on in the sub items. essentially a summary of all of my tasks associated with this property.
Now, if I want to see more information, I need to hover over it and I can see it's 50% one not started, 50% working on
it. And as I add more tasks, this will update depending on the statuses. Now, what I like to do is I actually like to
add a progress column. I think it's a really easy way to track projects. So, I'm going to add a progress.
And here you can see that right now it's just telling me the progress is zero. Once I change this to done, so the
progress tracking changes to 100%. Now I'm going to do the same thing. I'm going to roll it up to the item level.
So here you can see a summary. Now obviously on the sub item level just showing me this is 100% or zero doesn't
really mean much. But on an item level, I like that it tells me the percentage. So I can easily see what's going on.
Now, this is a really easy example and it's only 50%. But once you have a lot of projects, you can visually look at
this board, see all of your projects and see the status of every single project. So again, just to summarize, the first
option in managing projects is to have one board. All your projects are the item level and your sub items are all of
the tasks. Then you can roll up either a progress column or a status column. So you can easily glance at this board and
understands where every single project is holding. The next way that you can track projects is something called
highlevel and low-level boards. This is a pretty popular term within the Monday world. And essentially what it means is
that you have boards that are high level meaning you look at the projects at a high level and then you have low-level
boards which are your actual tasks. So in this example the highle board would have all of the properties that we're
looking to purchase and manage and each low-level board would be for the property and then we can link them
together. Let's jump in and I'll show you how to do this. In this setup, you see that I have one projects board and
my properties are listed as an item on each board. Now, I have two other boards, which we're going to call
low-level boards for each property. So, essentially, each property has one board. And the idea is that we want
these property boards to link up to this project board, which we're going to call the highle board. In order to do this,
you need to create a connected board column. I'm going to show you how this works. But before we jump into this, I
do want to warn you that depending on what plan you're in within monday.com, there are limitations. If you are on the
pro plan of monday.com, you can only connect 20 boards. So, in this example, what it would mean is you have one
highlevel board that connects to 20 different property boards. You can't do more than that. If you're on the
enterprise plan, then you can have up to 60 boards. However, if you're on enterprise, the third option that we're
going to discuss is actually even better. So, let's hold off on this if you're on the enterprise plan. So, back
to our board. What I want to do is create a connected board column so that way we can see the information in both
boards because ideally on the highle board or the projects board, we want to look at all of our projects and
understand what they're up to. I'm going to click this plus button and I'm going to search for connected boards and click
on that option. Now I need to select the boards that I want. I'm going to click on select. And in this example, remember
I'm choosing my two property boards. Now before you press this blue button, connect boards, it's really important to
think about this checkbox. It's called create a two-way connection. What that means is, do you want to see information
on both boards? Meaning on the projects board, do I want to see all the information from the property board? And
on the property board, do I want to see all the information from the projects board? That's called a two-way sync. So
here I am going to click on this button and click connect boards. I'm also going to add a mirror column,
which is a status, and we'll get into that in a minute. So here you can see I have two columns added. And if we jump
to our lower level boards, you can see that a column was also added here. And a column was also added here. So if
I go to the projects board 123 Main Street, I am going to change the board to 123 Main Streets and add my two tasks
that are here. So here you can see I'm connected to the two tasks. I'm going to do the same thing for the other
property. again, add the two tasks. Now, let's go into the Main Street board and like I
showed you on the other board, we're going to add a progress column because I told you I think it's a really great
column and I'm just going to change this to done. Now, if we go back to the projects board, so here you can see that
we have the different statuses, but I'm also going to add the column here. I'm mirroring the column to this board. I'm
going to click on these three dots and I'm going to click on duplicate column. And here you could see this is an exact
duplicate. And now I'm going to go in and change the settings. I'm going to click on settings and I'm going to
change this to be a sorry on the fort I didn't add it on for street.
So here I'm going to add progress tracking. Now I wouldn't be able to add this on for street because it's not
there. So obviously I would need to add that to the board as well. And here you can see that I am 50% of the way
completed with this project. Again, I have the same option that I can look at this board of all of my projects and I
can see how much progress has been made, what the projects are up to. So, I can easily manage the projects on a high
level from this board for all of the tasks. They're on the low level. Now, one of the downsides of having this
setup is that you need to manually connect everything. You saw how I went in and connected everything. There are
ways to automatically connect everything and it's called match automations. If you click on the link above, there's a
link to a video about match automations which helps you automatically connect projects. So, it can match the item name
to something on the other board and then it will automatically connect in these columns. The next downside of this
setup, like I mentioned before, it depends on how many projects you have. If I need to have 100 property boards
because I'm managing a 100 properties and I'm on the pro plan, I obviously can't connect all of them. That's why
we're going to jump into the third option. The third option is enterpriseoning and it's something
called portfolio. This portfolio feature is something that's relatively new within monday.com and again it's only
for enterprise on the work management product. So I'm going to show you from the beginning exactly how it works. I
have to click on this plus button and here you see I have the option for project and portfolio. So I'm going to
click on project and I am going to rename this to be called projects and I'm going to create
it. Now this is essentially creating my highlevel board that we just had but
there's going to be a lot more features. I'm going to add my first project. And you can see here that I have some
template boards that I can use. So for this example, if you're doing property management, you probably have the same
tasks you need to do every single time. So you can create a template and use that as your project. For this example,
I'm just going to create a new project, and we're going to call it one 123 Main Street.
And I also have an option of a resource planner. For this example, I'm not going to add it, but it's basically capacity
management, like understanding who needs to be on this project, how many hours they need to spend, what they need to
do, and it's connected to a project. So, here you can see I have my projects board, and what automatically happened
is this project is connected to my lower level board, one 123 Main Street. this portfolio. I know I called it project so
it's it's confusing but it's really called in Monday terms a portfolio which is all of my properties. Why don't I
just rename it? So here I can see all my properties and they're connected to each lower level
board. So when I go into 123 Main Street, you can see here that I have that same connected board column that I
had before, but it's all automated. So if I add let's say a new task that we have of get permit, remember we had that
task. You can see here that it's going to automatically connect for you. See it automatically connected. What that means
is taking out this whole option of match automations and making sure everything's connected properly. It's automatically
connected. Now let's go back to our properties board and look at this. Here you have something interesting. Now on
the one hand you have the same status column. Remember we had that status column where we saw all the statuses on
the lower level property board. We still have that but we have a few additional things. The first important thing is we
have this project health and I can basically track in the lower level project board or in the portfolio board
of all my properties what we're up to off track at risk or on track. Now what's really cool about this is that
this pulls into a snapshot. So imagine I had a lot of properties here. I can easily glance at the snapshot and see
where everything's holding. It's a much better view than we had before of just looking at the percentages or just the
statuses. I also have options here. I can look at the statuses. I can see a percentage. So here I automatically see
25%. I don't need to do the progress column. I can if I want to. I do have the option of adding actual verse plans.
You would have to add dates to that. And [snorts] I can also see who the people are. I don't have anything written here,
so that's why it's not showing up. You also can automatically generate a report about all the projects. And monday.com
literally goes through all of your projects and it generates a report for you about the status of all of your
projects. Now, one of the huge advantages of the portfolio feature is the number of items that it connects to.
I'm pretty sure it's about 100, but it actually changes all the time. And I know that the goal is that they're
supposed to get or maybe it's 200 even. I'm not even sure because I know that they're changing it. But the goal is to
get to a thousand. What that means is that you can have a thousand properties. I hope your business is big enough to do
that. But if you're working on that level, you can have a thousand properties managed all in one portfolio
board. You also can then have a dashboard that you can see all of the data from all of these properties.
Again, if we would set it up the other way with the highle board and the low-level board, your dashboard would be
limited because on the pro plan, you can only connect 10 boards to a dashboard. And on the enterprise plan, you can only
connect 20 boards to a dashboard. So, another great feature of this portfolio is you can have all of your boards
connect to one dashboard. So, you can gain a lot of valuable insights in one place. This is great for an executive
team that wants to see in the big picture what's going on. They can come to this properties board and see all
their properties, the status, everything that's going on in one glance. And they also have the dashboard. Just to
summarize, we spoke about the concept of having a highlevel and a low-level option to view all of your projects.
Again, high level is where you see the high level of all of your projects. Low level is all of the details like the
tasks. There are three different options that we explored in order to track this information. You either can have item
level and sub item on a simple board or you can have highlevel [clears throat] boards connected to low-level boards.
And finally, you can use the portfolio feature with projects if you're on Monday enterprise plan. If you're
interested in doing a deeper dive into portfolio feature, click on the link above and I'll see you there. Hit the
like button if you enjoy this video and remember to subscribe to receive tips and tricks on how to use monday.com.
Thanks so much for watching and I'll see you soon.
The three methods are: Method 1 uses a single board with subitems for small teams or simple projects; Method 2 separates high-level projects and low-level task boards using connected boards; Method 3 is the advanced Enterprise Portfolio feature for large-scale project management, available only on the Enterprise plan.
Create one board where each project (e.g., a property purchase) is a main item and all tasks are subitems. Use a Status column on subitems, enable 'Show summary on the parent item' for a condensed view, or add a Progress column for percentage completion. This keeps everything in one place for an instant project overview.
Method 2 uses separate high-level and low-level boards with manual setup via a Connected Boards column, suitable for up to 20 projects on Pro or 60 on Enterprise. Method 3 automates this with a Portfolio, creating low-level boards automatically, supporting up to 100-200+ projects, and offering rich metrics like Project Health and auto-generated dashboards without manual column setup.
Method 1 (Single Board with Subitems) works on all plans. Method 2 (Connected Boards) requires a Pro or Enterprise plan. Method 3 (Enterprise Portfolio) is exclusive to the Enterprise Work Management plan.
Use a Mirror Column on the high-level board to display status or progress from the low-level board, enabling two-way connection for updates. Additionally, set up match automations to automatically connect new items between boards, streamlining the setup process.
The Portfolio bypasses dashboard connection limits (Pro: 10 boards; Enterprise: 20 boards), allowing all project data in a single dashboard. It offers automatic sync, built-in metrics like Project Health (On Track, At Risk, Off Track), auto-generated snapshots, and status percentages without manual progress columns, making it ideal for large-scale operations with up to 200+ projects.
Start with the Enterprise Portfolio (Method 3) for maximum automation, scalability, and visibility. It handles 100-200+ projects automatically, integrates rich reporting, and eliminates manual setup. For smaller operations, consider Method 1 first, then upgrade to Method 2 as project count grows.
Keep this summary
Save it to LunaNotes and it becomes a real note in your library — editable, searchable, and ready to turn into flashcards or a diagram. Free to start.
Save to LunaNotesOr summarise for another video.
This summary and transcript were automatically generated using AI with the Free YouTube Transcript Summary Tool by LunaNotes.
Related summaries
Comprehensive Overview of Project Management Concepts and Practices
This video provides an in-depth exploration of project management, covering essential topics such as project planning, execution, monitoring, and closure. It also discusses the roles of project managers, key project management tools, and the significance of certifications like PMP.
The Ultimate Productivity System: 6 Essential Modules for Enhanced Efficiency
Explore Ali's complete productivity system with evidence-based tools for a healthier, happier, and more productive life.
Comprehensive Guide to Stakeholder Management in Project Management
This detailed summary explores the essentials of stakeholder identification, categorization, prioritization, and engagement within project management. Learn practical strategies, key models like the power-interest matrix, and the role of stakeholder engagement plans to ensure project success.
The Evolution of Product Teams: Insights from Industry Leaders
This video discusses the importance of maintaining small product teams to preserve a singular vision, the shift towards design-first sensibilities in product development, and the challenges faced by larger organizations in maintaining product quality. It highlights key figures in the industry and their approaches to product management and design.
Boosting Productivity: Essential Tools and Approaches for Efficiency
Explore top productivity tools and strategies with insights from experts Scott and Wes on how to maximize your efficiency.
Most viewed summaries
A Comprehensive Guide to Using Stable Diffusion Forge UI
Explore the Stable Diffusion Forge UI, customizable settings, models, and more to enhance your image generation experience.
Kolonyalismo at Imperyalismo: Ang Kasaysayan ng Pagsakop sa Pilipinas
Tuklasin ang kasaysayan ng kolonyalismo at imperyalismo sa Pilipinas sa pamamagitan ni Ferdinand Magellan.
Mastering Inpainting with Stable Diffusion: Fix Mistakes and Enhance Your Images
Learn to fix mistakes and enhance images with Stable Diffusion's inpainting features effectively.
Pamamaraan at Patakarang Kolonyal ng mga Espanyol sa Pilipinas
Tuklasin ang mga pamamaraan at patakaran ng mga Espanyol sa Pilipinas, at ang epekto nito sa mga Pilipino.
How to Install and Configure Forge: A New Stable Diffusion Web UI
Learn to install and configure the new Forge web UI for Stable Diffusion, with tips on models and settings.
Found this summary useful?
Take it with you. One click puts it in your own LunaNotes library.
Save to LunaNotes